ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-43 4
(3.80)
AS-BUILT DRAWING NUMBERS AND DATES:
2B-918
9=12/27/50
2-923.
12/27/50
28-476
12/27/50
2B-652
12/27/50
28-929
28-938
12/27/50
§=12/27/50
28-5134 12/27/50
"Property
2B—381
JOB NO.
640 -1
12/27/50
FS~291-1 «12/27/50
CONTRACT NO. 29-15-507_
For:
The Complete Construction of
Buliding No.: 221
FS-291-2 12/27/50
DESCRIPTION OF PROPERTY UNITS
.
Page 7h
27 December 1950
ESTIMATE
Quantity
Unit
Construction
Cont ract
Est'd. Value
Govepuro shed
Engineering
Cost
Total
TASK FORCE HEADQUARTERS BUILDING
Cae story alusinum construction; "E" shaped; sise I.D. 2)'-0" x 152'-6 1/2" x
12'~0" high, with three 2'-O" x 106'-8 1/2" x 12*-0" high wings; set on 5" thick
concrete slab; double roof, separated by 2" x " redwood; vented window panels;
sluminum partitions; cabinets, shelving, sap boards, tables; weather proofing and
insulation; two concrete walks '-0" x 35'-O"; communication facilities consisting
of two elevated catwalds, 5'-3" x 8'-0", each mounted on two poles extending 10
feet above ground with « messenger cable running between Worth and South catwalks;
two 10 EVA electric plants mounted on a reinforced concrete alab 10'-0" x 10'=0",
located 55 feet west of north-west corner of building; two runs of 2" conduit,
underground, extending from slab to teletype roam of building; with electrical
wervices; pluabing; floor area 0.D. 11,930 square feet; cubic content I.D.
113,482 cubic feet.
Installed equipment and furniture includes: Four water coolers with drinking
fountains, ome door vault, and two exhsuster fas.
or_68
DATE OF THIS REPORT:
Task Force Headquartera Building
“
26
"Not for use by A-E
LOCATION PARRY ISLAND - SITE "8B"
FS-293-3 12/27/50
Account
SHEET NO.
Meee
COMPLETION REPORT FOR
1
Each
Direct
Indirect
$1,327.76
46, 619.
*,
$1,671.16
$139,818.35
*Proration
Charges to ofUnits