ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO.43 a
13.50)
AS-HUILT
ORAWING NUMBERS
3H-253.3
JOB NO.
AND DATES:
3H-250.4 2/2h/51
3-251 2/24/51
HH-25204 2/24/00
For:
AT-1 29-13-5607|
Location
No.:
DESCRIPTION OF
-
.
ee
Quantity
_
lol _ OF
DATE
OF
THIS REPORT:
2h February 1951
Station Mo. 823
ee
PROPERTY UNITS
NO |
"Not for use ty A-E
EWIWETOK ATOLL
pa
ete
SHEET
The Complete Construction of Wing Models
Building
2/24/51
"Property
7
(ONTRACT NO.
G2 = 10
30-088 2/24/51
170-817 2/24/51
BH-254.4 2/2h/51
oe
Account
Number
ee
COMPLETION REPORT FOR
Unit
_—___|—_
Construction
Contract
Cast
tS TT
1 MATE
.
y kstta, Value
Gov, Furnished
Material
‘
:
ng i nee ri ag
Lost
"Proration of
Charges
po
AMC HSQUIRED CONSTRUCTICN AND LOCATION OF THE FOLLOWING STATION:
WIM0 MODELS,
STATION
£623,
SITE "Q*
Aocurately located reinforced concrete foundations as follows:
4 and B. one each 1h'=-0° wide x 12'-0" x 2'-0" thick with two 14'-0" long steel
a
Ported horisontally to each.
Concrete Total « 25 cu. yds.
By and By ons each 10'-O" x 16'-0" x k'-0" thick with two 16'-08
bolted bérisontally to each.
Concrete Total - 47.4
steal columns
cu. yds.
By one 2'-O" x 1,'-0* x 2'-0* thick with threaded J bolts pro
two deadman, concrete, with 3/l" diameter protruding J bolts, sise each }'-8" x 3'-8" x
3'=0", one on each side and steel junction box with underground conduit.
Concrete Total - 10.3 cu. yde.
Bj, one 6'=0" x 9's" x 2'-O" thick with two 9'~O" long steel columns bolted
horisontally and steel junotion box with underground conduit.
Concrete Total - 4 cu. yds.
1
Each
Direct
Indirect
$16626.62
12,102.15
o,f
$251,.80
‘9
$26,983.57
to unite