COMPLETION REPORT FOR
Ae
3E-5661.1
3E-5319
3E-5440
.
.
!
ATEN
:
ne
at
mrp,
Jus
3/9/51
3/9/51
3/9/51
NG.
129 ~ 2%
CONTRACT NUL
for:
wee ee
RIF TOON OF
LOCATION EMIWETOK ATOLL
*Not
tor use by A-E
DATE
OF
Station No, 13la
Now:
+
— §f>TiMaATe
ee
Quantity
PROFERTY UNITS
THIS REPORT:
9 March 1951
The Complete construction of Connecting Pit and Detector
tHuilding
t
AT-0 29-1 1-0?
SHEET NO OE or,
wa
ae
ane
-
ap
ketlad.
Urvt
fp
sov.
a
-
_
~
~~
~7
—-- ——_——_ -- -+-
Value
Furnished | Engineering
Material
-—
"Proration
Cnarges
Cost
'IGRL AND NRLK REQUIRED CONSTRUCTION AND LOCATION FOR THE FOLLOWING STATIONS:
CONNECTING PIT AND DETECTOR, STATION NO, 131m ON SITE "E*
A reinforced limonite concrete structure, on a coral concrete foundation, sise
O.D, 14'-0" x 11'-10" x 10'-11" high, with one end opening to an adjoining
limonite slab 14'-0" x 10'-9# x 2'-6" thick, 4" coral slab at opposite end,
total 70 cubis yards limonite concrete and 35 cubic yards of coral concrete
inoluding the connection pit on the opposite side of the limonite slab. The
pit sise 1,D, is 9'-O" x 9'-0" x6'-0" deep with 3" walle and floor slab sloping
to a sump pit in one corner, The overall dimensiones are 41'-1" x 14'=O0" x 10'-11"
above grade and bottom of the pit 6'-8" below grade, The structure is to be
closed, later, under the supervision of the user, with 578 limonite cubes
size 7 7/8" x 7 7/8" x 7 7/8", The completed struoture includes electric
wiring and fixtures, plumbing and dehumidification equipment,
i
Each
Direat
Indirect
$47 ,698 03
$71,345 ,84
21,161,75