ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE $FOQ.43 a 13.50) AS-BUILT COMPLETION REPORT FOR JOB NO. 729 = 19 DRAWING NUMBERS ANL DATES: 699.4 3/9/51 H~5636 ,2 3/9/52 For: 3/9/51 W049 CONTRACT NO, AT~{ 29-1 1-507 Se? SHEET wO. Now: oF “Not for uge by A-E DATE OF THIS REPORT: LOCATION JITW@ETOK ATOLL 9 Marek 1951 The Complete Canstruction of Wood Building Building 66 Station Ho, 7 ESTIMATE “Property shall —— LESCRIPTION QF PROPERTY UNITS Quantity Unit Construction Contract Estid. Value Gov. Furai shed Engineerin vee 9 Total Le NR, L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS: WOOD BUILDING, STATION NO, 7 CM SITE """ 4 one story, wood frame, flat slope roof and sides alusimm covered, wood floor, erected on four reinforced concrete columns and tis beams, elevated §'-0" over water, complete with electric wiring and fixtures and telephone installation, eise I.D, 9'-1" x 91-2" x 81-0 1/2" high above floor which is 14'-8* x 10'-8*, 1 Each Direct $4,878,05 Indirect 4,719 64 $96.20 $9,699.99 3,184.83 78,00 7,022,91 3,840,968 3,159.1 79 62 7,979.93 WOOD BUILDING, STATION BO, 7 ON SITR "R* 4 ons story wod frame, flat slepe reef and sides aimmimwm covered, erected on a 12° concrete alab, sise 10'-8" x 10'-6" complete with electrio wiring and fixtores and telephone installation, Sise I,D, 9'-1" x 9'-1" x 61-0 1/2" high, 1 Sach Direet Indirest, 3,760,08 WOOD BUILDING, STATION NO, 7 OM SITE *P* A one story wood frame, flat slopes roof and sides aluninun qovered, erected on a 12" conerete slab, sise 10'-8* x 10'-8", complete with electrie wiring and fixture and telephones installation, Sine I.D, 9-1" x GI-1" x 8!~O 1/2° high, 1 Eeeh Direct Indirect) "Prorati f Charges to Units

Select target paragraph3