ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO.43 a
(3. 50)
AS-BUILT
COMPLETION REPORT FOR
JOB NO,
DRAWING NUMBERS ANO DATES:
Mae 176-808 ait
VaVar
17-807
17G=804
1/31/51
3¢-627,2 2/10/51
:
ae
I*property|
Recount
Number
CONTRACT NO.
For:
vaya
170-802
mee
729 + 15
AT-( 29-1 )-507
?
lee
LOCATION
*Not for use by A-E
DATE OF TH
EMIWETOK ATOLL
s
Building No.: Stations 20a thru f, 21a thru o, 23a and b, 25
ESTIMATE
Unit
DESCRIPTION OF PROPERTY UNITS
Construction
Contract
Cost
.
.
Engineering
Cost
BLAST WALL STATION NO, 20a THRU f, SITE "C*
Two reinforced concrete walls, 10'-6" x 5t~O" x 1'-0", on reinforced soncrete
foubdation 4'-0" x 334-0" x 2'-9", Steel field panel S'-0" x 51-0" x 11-08
Conduit sleeves, eto,
Fach
Direct
Indirect
At
|
|
0,
REPORF:
The Complete Construction of Blast Buildings
NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
betwen walla,
OF
208
$27, 595,34
11,034,09
$1,471,01
28 344,25
11,877.63
1,482,89
nEe
Two reinforced concrete walls, 10'-6" x 5'-0" x 1'=0", on reinforoed concrete
foundation 41-0" x 33'-0" x 21-9" Steel field panel 8'-O0" x 51-08 x 1'=0"
between walla, Conduit sleeves, eto,
Each
Direct
Indirest]
BLAST WALL STATION NO, 2la THRU o, SITE "E*
Two reinforced concrete walla, 101-6" x 5'-0" x 1'-0", on reinforced concrete
foundation 4'-0" x 33'~0" x 2t-9", Steel field panel S'-0" x 5'-0" x 1'=08
between walls, Conduit sleeves, etc,
;
Each
Direot
Indirect
14,481.72
6,040,47
758,99
242,82
3,036.46
142,43
CONGRETE BLAST BUILDING, STATION 23a, SITE "C"
Existing reinforced concrete structure rehabilitated and added ventilation and
electrical, backfill, Inetalled equipgent includes one fan,
Each
Direct
Indirect
CONCRETE BLAST BUILDING, STATION NO, 23a, SITE "D - V"
An existing reinforced concrete structure rehabilitated, added ventilation,
electric wiring and fixtures, telephone installation and backfill,
includes one fan,
Equipment
;
Each
Direct
Indirect
2, ile
2,863,
108,06
*
Proration of |
Charges to Units