ATOMIC ENERGY COMMISS/ON
SANTA’ FE OPERATIONS OFFICE
SFO. 430
13. 50}
COMPLETION REPORT FOR
AS- BUILT DRAWING NUMBERS AND DATES:
JOB NO. 789 = 3
34-690 - L/2/51
CONTRACT NO. _AT-(29~1}-507
For:
30-077 - L/2/51
sHeeT wo. 34or
Soa
LOCATION
"Not for use by A-E
BMTWEEOK ATOLL
DATE OF THIS REPORT:
2
il 2
“r
ted
The Complete Construction of Booed Building
Huiiding No,:
Station TTS
ESTIMATE
Sy
"Property
Account
-
ae
DESCRIPTION OF PROPERTY UNITS
Number
Quantity
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished
Material
Engi
Agi neering
Cost
*Proration of
Total
Charges to Units
AFOAT- REQUIRED CONSTRUCTION AND LOCATIONS OF THE FOLLOWING STATIONS:
STATION 775, SITE "A"
A one-story, flat roof, wood building, aise 0.D, 10'-O" x 10'-0" x 7'-8" high,
eet on a continuous reinforced concrete foundation.
A masse concrete blook sise
5'-0" x 5'-0" x 6'=6" ig installed in center of floor area and extends from bed
rook to floor level and is separated from building foundation by compacted sand
f111. Walle and roof are covered with mopped-on roofing felt. Laminated wood
Goor, light proof slosure, is covered with mopped-on roofing felt. Complete
with eleotrio wiring end fixtures, floor area 0.D. 100 square feet.
1
each
Direct
Indir ect
:
fase
55
$ 1.8
$
44.02
CAUI
aa
t
dorumen: contain
Natlomal | 4 4ense of
trinpenleniok on te et
Oy Manne ie Be
5
J
ings
turited ont May ott
altiey cette apore ot