Ma
ATOMIC
— SANTA
SFO. 43
AS-BUILT DRAWING NUMBERS AND DATES:
FEn69,
ooh
JOB NO.
COMMISSION
PERATIONS OFFICE
0
COMPLETION REPORT FOR
For:
ee
LOCATION
CONTRACT NO, 29-1
729 = 32
4/2/52
FE
ENERGY
;
SHEET NO.
Not
32
for use
by
OF
AE
DATE OF THIS REPORT:
2 April 1951
¥
ENTWETOK aTOLL
The Compiete Construction of Hole in Ground with Concrete Fill
Pr
%
,
€
Building No.: Station Nos, 6101, 6102, 6103, 6104 and 6105
ESTtMATE
«
Property
DESCRIPTION OF PROPERTY UNITS
Account
.
Quantity
.
Unit
Construction
Contract
Est'd.
Value
.
Gov.Furnished
Engineerin
oe 8
*Prorati
f
Charges to Units
Total
4.C,C, REQUIRED CONSTRUCTION AND LOCATIGN OF THE FOLLOWING STATIONS:
HOLE IN GROUND WITH CONCRETE FILL, STATICH NOS, 6101 THRU 6104 ON SITE "E*
Square holes in the ground, aise 3'-0" x 3'-0" x 3'-0" deep with 4" concrete footing
in hole, Holes to be filled with concrete when instruments are installed by user,
4
Each
Direct
Indirect
$623.76
707 91
$904
$1,340.71
155,92
176,97
2,26
335,15
HOLE IN GROUMD WITH CONCRETE FILL, STATICN WO, 6105 OM SITE *S*
Square holes in the ground, sise 3'-0" x 3'-O0"8 x 3'-0" deep with 4" concrete footing
in hole,
Holes to be filled with concrete when instromenta are inatalled by user,
1
Each
Direct
Indirect
a
ee,
;
eet
“This decum@t cont
pformation affecting
the Natena |
ferPeGine United States [ta
transmineses
the dG
a of ite enntents
in eny new
prohibited edi
te an @ufthorieed peron ie
may Sede
in severe criminal