ATOMIC ENERGY COMMISSION
““ SANTA FE OPERATIONS OFFICE
nfo. dso
100-261-1
3/28/51
Fs-499
3/28/51
100=261-2
CONTRACT NO.
JOB NO, 730.3 = OF
A ited 1) OkAW) Ne NUMBER AND UATE:
for:
3/28/51
_AT-( 29-1/-507__
bee
a
vumbe “p
me
Santee
DATE OF THIS REPORT:
28 Mareb 1951
[Tne Complete Construction of Air Poros Idealised Models
Building No.: 3,3,
-
-
GESCRIPTION OF PROPERTY
ee abe rts |
“Not for use Dy A-E
LOCATION MUZIN ISLAND - SITE *S*
:
UNITS
-
Reefe
ve
Quantit
.
of
”
Unit
__
ESTIiMAaATe
a
fom
sweet no. 27 of8
eae.
COMPLETION REPORT FOR
an
a
Ceetraet.e
east
{
uo, Pura sned
~ Material
.
—
_
_.
_.
Total
Engineering
“Proration of
Charges to Units
°
Cost
P
f
| STRUCTURE 3,3
|
|
4 atructure consisting of prefabricated reinforced concrete wall and roof slabs,
walls bolted to anchor plates embedded in a 12° reinforced concrete floor slab,
aise 16'-10" x 245-0", with six 3 foot square by 9" thick footings under slab where
atructural stee] columns bear and support the roof slabs, all wall and roof joints
are fibreglass sealed four 3 1/2" extra strong pipe struts join the side walls
horisontally, diagonal bracing is provided from each end of the pipes to the center
of the floor slab by 1/2" dia, steel rods with turnbuckles, wall and roof sections
are 10° thick except rear mill is &*, Floor ares 0,D, 452 square feet, cubic feet
inoluding floor slab 3,692,
|
.
:
|
|
Baoh
Direot
Tndirect
|
i
1
Instrumentation
Direct
Total Structure and lostrusentetion
Direct
Indirect
Indirect!
$6,712.94
6,715,122
6,537.58
6,661.40
15,250.52
13,376,52
$15,428.06
-O$4,579.53
17,778, 51
4s 579,53
33,206, 57
|
|
\