COMPLETION REPORT FOR
A nie ppl feAA ENG, NOME)
100-261-3
3/28/51
AND DATE at
On NUL
7303 = OF
CONTRACT NO. | AT=(29-1)-507
a7
Fur:
LOL ATttON
the Complete Construction of
.
“Property
gant
-
i
:
Peer
eto
ay
<5
CRGORTRTION OF PROPERTY UNITS
;
“5
.
Cuantity
[
"Not
for
DATE
OF
RENGEBI ISLAND - SITE "E*
_
“
woe
_ UF
by
ce ee EM ATO
{or ne
:
unit
Puastr, tian
.
vont ~ t
Est'a.
Value
on
rnishe
owe unten "|
bnginee
Ines
+ ost
rin
y
9
o
Total
| STRUCTURE 3,3,8f
i
|
|
|
4 structure consisting of prefabricated reinforoed concrete wall and roof slabs,
walls bolted to anchor plates embedded in a 6" reinforced concrete floor slab, sise
&'-10" x 6t-O0", with six 1 foot square by 3" thick footings under elab where struotural steel columns bear and support the roof slaba, all wall and roof joints are
fibreglass sealed, four 3/4" std, pipe strute join the side wall boriszontally, diagonal bracing is provided from each end of the pips to the center of the floor slab
by 1/4" dia, steel rods with tournbuckles, wall and roof sections are 2 1/2* thiek
‘xcept rear wall is 2", floor area 0,D, 29 square feet, cubio feet including floor
@lab 66,
|
Instrumentation
Total Structare and Instrumentation
i
Each
Direct
Indirest
$4,890.76
1,686, 42
Direct
Indirect
2,518 48
2,764, 42
Direct
7,409, 24
Indireat
-~0-
$6,577.18
$1,024.18
|
4,450.84
1,024,18
6,307 ,08 -
12,884,26
“Thi document
SSee
Ak
THIS KEPORT:
!
|
i;
:
;
|
1
28 March 1951
ddr Porae Idealised Model 1/4" Seale
buildieg Now: 2ada8f