ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 43 0
(3. 50)
AS-BUILT
Se
COMPLETION REPORT FOR
DRAWING NUMBERS AND DATES:
100-253-1
JOB NO. 730.3 - 9q
3/20/51
CONTRACT NO.
For:
AT-{ 29-1 )-507
LOCATION
Tne Complete Construction of
Building
No.:
SHEET
WO
13 a
or 38.
“Not for use by A-E
DATE OF THIS REPORT:
26 Maroh 1951
MUZIW ISLAND - SITE *g*
gir. Porce Structure Type P-2
3ede5d
ESTIMATE
seropen,T .
ee
Account
|
GESCRIPTION OF PROPERTY UNITS
7
Quantity
“T const ruc tion
Unit
Number
Contract
Cost
—
Est'd.
Gov.
Value
Furnisneal
Materiai
.
.
Frgi neering
Cost
Total
BUILD ING BO. 3.3 .5d
A two story brick building, gable roof sheet metal covered, erected on concrete
foundation walle 1'-) 1fe x 5°-1" deep, sise 34°-0" x 421-9", interior brick
walle sapported by 1'-0" oonerete foundation walle, five interior brick masonry
fire places, 3" bitumal oconarete on sand support sleepera for tongue and groove
flooring of the first floor, sand between second floor joist and ceiling joist,
metal lath od plaster covered walls and partitions except entrance and stair
halle, sonorete extrance slab, the outside dimensions of each floor ig )2'-1" x
335'-" giving a total floor area of 2000 square feet, 10'-6" ceilings give «
subio sontent of 29,100 eublo feet.
1
each
Direct
Indirect
Instrumentation
Tota] Structure and Instrumentation
$53,525.
1, Tle 79
Direct
6,
Indireat
5,
Direct
Indirect
3?
TT.
& ,023.53
53, 389.93
-0-
$101,238.39
$527 .27
12,702.34
527.27
113,910.73
"Proration of
Charges to Unit