ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-.436
13.30)
COMPLETION REPORT FOR
JOB NO. 640 - ju
AS-BUILT DRAWING NUMBERS ANDO DATES:
FS-630
CONTRACT NG.
F or:
5/7/51
SHEET NO.
S SS
AT+l 29-1 |-507
LOCATION
1
OF,
29
“Not for use by A-E
JAPTAN ISLAND = SITE *L®
The € C omp lete
tion of C oncrete
te Slabe 8 foror Tent
ete Const
nstruction
ents
DATE OF THIS REPORT:
7 May 1951
Building No.: 67, 68, 69, 70, 72, and 73
ESTIMATE
.
Property
DESCRIPTION OF PROPERTY UNITS
Account
Quantity
.
Unit
Construction
Contract
Number
Est'd. Value
Gov. furnished
Engi
i
noineetog
Total
4
OONCRETE SLABS FOR TENTS
Slabs No. 67, 68, 72, and 73:
complete with anchor bolts.
Slabs Mo. 69 and 70:
anchor bolts.
A 4" concrete slab, size 15'-10" x 31'-10",
4k" concrete slab, size ly'=4" x 1h'-6", complete with
b
Each
2
Each
Direct
Indirec
$333.47
311.59
$645.06
*pCharges tocunits