ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS-BUILT ORAWING NUMBERS ANDO DATES:
21-963
12/23/50
12/23/50
12/23/50
12/23/50
12/23/50
12/23/50
12/23/50
12/23/50
12/23/50
*Property
JOB WO.
640 - 3m
CONTRACT NO.
For:
LOCATION
AT-( 29~1 )-507
SHEET MO.
Bullding No.:
12/23/50
1
Zi.
DATE OF THIS REPORT:
23 December 195)
11
ESTIMATE
Quantity
Unlt
Construction
Est'd. Value
Contract
Cost
Gov. Furnl shed
Material
Engineering
Cost
Total
POWER AMD WATER DISTILIATION PLANT
Qne story concrete and prefabricated aluaimm construction; double roof)
rectangular shape; sise I.D. 24'-O" x 55'=-2 1/2" x 17'-3"3 set on a 6" reinforced
concrete slab, with drain facilities, pipe tunnels, pipe trenches and covers;
reinforced concrete equipment foumtiations; standard alusinus wall panels set on
slab and above S'-3" high reinforced concrete walls in a 17'-5" portion of the
buildings vented window panels; eliding doors; piping systems; with electric
wiring and fixtures, power wiring and control services; floor area 0.D. 1,119
square feet; cubic content 1.D. 15,L45 cubic feet.
Outaide Building -—- Diesel o11 and gasoline tank stand of wood, Douglas fir,
5'-0" x 7'=-0" x 5'~8", cormer posts, sills and beams 12" x 12", diagonal bracing 1° x12". Platform, 11'O8 x 7'-0" with 1° x 12" flooring, supporting two tanks,
steel, welded, sise 5'-O" x 7'-O0" x 5'-O". Fuel oi] tank, 100 gallon, aylinder
steel.
Installed equipment includes:
-_ OF.
"Not for use by A-E
JAPTAN ISLAND - SITE “L"
The Complete Construction of Power and Water Distillation Plant
DESCRIPTION OF PROPERTY UNITS
Account
Number
Sduit
Two generator units, four distillation units,
three pump units, cubloles, piping and control equipment.
Costs for these items
are not recorded on this eheet, but may be found in Power and Water Facilities
Reports.
Direct
Indirect
$1,024.61,
$50, 383.78
“Proration of
Charges to Units