ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
$FG.434
(3. $0)
AS-BuUILT
DRAWING
NUMBERS
8B-53k2 6/5/51
6E=-5343
6/5/51
88-S3kk 6/5/51
pa
SR.
COMPLETION REPORT FOR
AND
DATES:
JOB
NO,
8B-53K7 6/5
85-53e8
CONTRACT
129 - uw
For:
6/5/51
Account
Number
mn
Now:
-—ee
Construction
Quantity
Contract
fost
Est'd.
Gov.
Value |
Furnished
Material
:
;
Engineering
Cost
Total
QOAKIAL CABLE SYSTEM, SITE *E/"
Bouxial cable system includes survey for and installation of cables, trenching,
and backfill, and treaoh stations.
Following figures are approxiaste.
Trench
Cable
nu
5 dune 1951
Coaxial Cable Syste
EsTIMATE
DESCRIPTION OF PROPERTY UNITS
OF
“Not for use by A-E
DATE OF THIS REPORT:
LOCATION ENGSBI ISLAND - SITE "Ef*
AT-( 29-11-50?
The Complete Construction of
Build ing
dE-5345 6/5/51
85-5346 6/5/51
“Property
NO.
SHEET WO.
1h,29S Lin. Fee
573,765 Lime Fte
Direot
$85,285.49
79 621.643
$339 68
$165,246.60
|
*Proration of
Charges to Units