ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
-'
SHEET NO __ 26 or_2}
COMPLETION REPORT FOR
AS-AUILT DRAWING NUMBERS AND DATES:
JOB NO. G40 » Bf
CONTRACT NO.
For:
“Not for use by AcE
AT-(29-1)-507
LOCATION ENGQEBI ISLAMD - SITR Ef
DATE OF THI @ REPORT:
The Complete Construction of Sedieutifie Stations not covered by
gui laing No.:
detailed Ae-bullt drawings.
7 "°°" tations Noe bof, 164, 132ef, 13204, 160¢ thra 1664, and 415
3
9T daly 1951
ESTIMATE
“Property
Account
Number
| re -
we
DESCRIPTION OF PROPERTY UNITS
a
Quantity
Unit
——
Construction
Contract
Cost
—
tst'd. Value
Gov. Furnished
Material}
Cnai
.
noe 9
Total
*p
Charges to Unite
*
STATIONS
30'* wood reflector poles instalied as requested by Users
7
Each
Direst
Indirect
$ 627.08
257280
$ 3.18
§ 888.06
RADAR BEACON, STATION 6)54
|
240 Volt aC power installed for this atation. Eqipment installed by Users
1
£
ae
Each