ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3. $0)
SHEET NO.
COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS AND DATES:
FS-365-1
FS-365-2
2/24/51
640
2/24/51
CONTRACT NO.
For:
AT—4 29-1 }-507
LOCATION
PARRY ISLAMD - SITE "B*
No.:
OF.
68
4
DATE OF THIS REPORT:
The Complete Construction of Beach Houses
Buliding
?
«Page 147
"Not for us@ by AE
2h February 1951
151 and 152
ESTIMATE
“Property
od
DESCRIPTION OF PROPERTY UNITS
‘Number
Quantit
.
”
fo
Unit
Construction
Contract
Cost
Est'd,
Value
Gov. Furnished
‘Material
Engineerin
eriag
Cost
Total
°
BEACH HOUSES
Thies is a one story wood frame, shed roof of felt composition, sheet metal siding,
erected on a 6" concrete slab 32'-0" x 47'-O0" which includes an 6'-O" terrace,
total floor area 1,50 square feet, complete with electric wiring and fixtures,
end fresh and salt water plumbing.
Installed equipment includes:
Une 20 cubic foot refrigerator in Bldg. #151;
and one 40 cubic foot refrigerator in Bldg. #152.
2
1
TOTAL COST
2
Each
Each
Direct
Indirect
$5,695.83
5,212.07
Unites
$230.57
$11,316.47
$22,636.95
th
* prorati
'
Oration of |
Charges to Units