ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO.430
(3.50)
Ayerli
COMPLETION REPORT FOR
|
Ubeawi Qu NUM HE
Jou NO.
LaATES:
729 - EF
CONTRACT
For:
3B-5693 - 5/16/51
3B-5694.1 - 5/16/51
NO »
Carne.
Cc
SHEET no.
“Not
LOCATION
_AT=(29-1 3-507
of_ Zh
DATE OF THTS REPORT:
ENGEBI ISLAND - SITE Ef
16 Mey 1951
The complete Construction of Limonite Collimator Base
building No,:
§
for use by A-F
Stations No. 10/, Lf, 12/4, 14/4, 15f, and 19/
ES 4MATE
r
]
oeRreojperty |
LESCRIPTION OF
Acowunt
Number
' LIMONITE COLL IMATOR BASE, STATIONS 104, 224, 224. 244, 154, and 194, SITE EY
:
Station No,
Station No,
Footings
Footings
Station No,
Station No,
Station No,
Footings
Footings
Footings
|
Statdon No.
289-0"
26'=0"
2810"
26'=0"
xXVI
22'-0"
Type XIVIT
Type XXVIII 18'-0"
Type II
Footings Type XIV
x
x
x
x
x
x
12'-0"
10"=0"
12'-08
12'=0"
10'-0"
9'-o8
x 5tagn
x 4'-08
x 5.0"
x 4t-0"
x 4'=08
x 4' <8
GEEERS
|
'
Reinforced concrete base below grade. Structural steel above grade, anchored to
base and providing means for adjusting and clamping collimator blocks into proper
position, Collimetor blocks are furnished by others. The variations in the
stations listed are indicated by the following:
Type ITI
tap
Quantity |
PROPERTY UNITS
Unit
Constrou. tion
Contract
Cost
l
Est'a.
Value
ocov. Furnished
Material
Engineering
Cost
Total
cubic yards
cubic yards
cubic yards
cubic yarda
cubio yards
cubic yards
Each
Station 10/
Direct
Indirect
$ 29.93
$
9,390.64
Station 11/
Direct
Indirect
Station 12/
Station 144
28.48
8,764.60
71.37
9,603.17
24075
8,271.20
16.27
5530.79
15.81
5 487.24
Bach
Direct
Indirect
Each
Direct
Indirect
5 206.82
3,039.63
Station 154
Direct
Indirect
atin alficring
la
tea & 1a
iad
(tar fa
Station 19/
3463.86
2,050.66
Each
Direct
Indirect
3354.92
2,1168F..
bcos
rl
*Proration of
Charges to unit
} -— dT
oe