Byeeh
Fas no.

05014
USER

SCIENTIFIC STATION NO.

JTF-8
FUNDING

AGENCY

AEC

None
($000)

ENGR

~

PRE-GO

Prior Cost 10.9

FY 69

3.5

.-.

PROC

CONST

TOTAL

63.8

.

FURM

74.7

18.4

21.9

whe bheaaah tee eee

TOTAL

‘

14.4 me pt 8262. + 9606
aM grt > Lo

PRIOR YEARS.

_ ¥ BAO heeoa

:

Co OB pe th uP bey me kenign
ewe APL
ENGINEERING

Gompletada ner :
thee mereitn + a4, tg de aie 3
OE ders vu eR |S

bt wee es ‘age

OM

tha. te sre

EiYoe

“
7

9

Drawings: JS 95-37-Al and AZ; ""J$.95-37-SL thruSe” §95-378Lthe
JS 95-37-C1.
oe aS 937M).thay, MB.3a95-37-Ri eg"
va

F

95D -002-<2e;

PROCUREMENT

Completed.

CONSTRUCTION

The rad safe laboratory, located in the southwest corner of

Damon Tract, is a 32 x 50-ft. single story concrete block structure with a con-

crete floor slab. Roofing is built-up and insulated. The masonry wails are
finished with gypsum board. The floor surface throughout is finished concrete.
Height of the suspended acousticalceiling is §-ft. Lighting fixtures are surface

mounted and fluorescente: This: facility, wtil be used for the calibration and repair |

of badges and instrumentecend.{fr trainfiig radsafe personnel.

The building contains ee rad safe aupply (450 SF), entry room (90 SF),
calibration range27 Ons ‘acdST}veedour room (180 SF), darkroom (60 SF), toilet
sae
rie paty Boom (285 SF}.

The darkrog ~

ft. long cou

The entire building is air conditionedand dehumidified by an exterior unit.’
Power supplied to the building ia 120/208 voit, 60 cyele, 3 phase. A fresh

waterline and a sewer line service the building.

service is provided.

(Completed in 1966}

5.94

Fire alarm and telephone

7

VOL Il

Select target paragraph3