30001

HF Communications Simulation Experiment - Subtask A611

USER

STRUCTURE “FACILITY NO.

TC

None

FUNDING
AGENCY

($000)

Bop

SCIENTIFIC STATION NO.

119-31

ENGR

PROC

CONST

TOTAL

PRE-GO
Engineering costs included in F&S Number 21003.

EAO 1106-

POST-GO

Estimate 12/65
TOTAL

GOr1)>

FOD9. |

DASA/
RDT&E
4101-61

0s

8.3

8.3

8.3

8.3

FURN

PRIOR YEARS
ENGINEERING

Completed.

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command furnished items are as follows:

high Log Periodic IJonospheric antennas; and,
contractor will furnish two 20 kw,

a) two 110-ft.

b) one instrument traile r.

120/240 volt,

60 cycle,

The
single phase, low

speed (1250 rpm) diesel generators. One of the generators is utilized asa back
up power source. In the event local power 1s available. only back up power is
required.

The contractor will perform the following: a) prepare a cleared, flat, 355 x 515ft. unobstructed area for the TC erected 110-tft. high Log Periodic Ion ospheric
antennas which will have a ground screen that extends

concrete antenna bases, as designed by TC in the field;
pads and anchors for the antennas;

into the sea;

b) construct

c) provide lon geron

d) site the instrument trailer; and,

e) install

the generators if local power is not available, and complete the electrical hookup
to the instrument trailer. The site location will be selected after a re connais sance by the project officer. Six scientific personnel will be assigned to Subtask
A6oll at this site.