aight.
WAKE
F&S NO.

TITLE

28001

HF Communication Simulation Experiment - Subtask A611

USER

STRUCTURE/FACILITY NO.

TC

SCIENTIFIC STATION NO.

None

BoD

111-3-1

05

Go*l
FOD GO+125

FUNDING
AGENCY

DASA/
RDT&E

0
($000)

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO
Engineering costs included in F&S Number 21003.

EAO 1106-) POST -GO
4101-61
Estimate 12/65

“TOTAL

8.3

8.3

8. 3

8. 3

PRIOR YEARS
ENGINEERING
Drawing:

Completed.
-111-002-Cl

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command furnished items are as follows:

high Log Periodic Ionospheric antennas; and,

a) two 110-ft.

b) one instrument trailer.

The

contractor will furnish two 20 kw, 120/240 volt, 60 cycle, single phase, low

speed (1250 rpm) diesel generators. One of the generators is utilized as a back
up power source. In the event local power is available, only back up power is
required.
The contractor will perform the following; a) prepare a cleared, flat, 440 x 670ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antennas which will have a ground screen that extends into the sea; b}) construct
concrete antenna bases, as designed by TC in the field;
pads and anchors for the antennas;

c) provide longeron

d) site the instrument trailer; and,

e)} install

the generators and complete the electrical hookup to the instrument trailer. Refer to Figure A-25, Appendix A, for site location. The four scientific personnel
assigned to Subtask A611 will also operate Subtask A628 at this site.

28-3

VOL Ii

April 1969