VITI LEVU, FIJI

F & S NO.
27003

TITLE

Measurement of Gamma,

Neutron, and Visible Radiation from

Fission Debris - Subtask A615
USER

TC

STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

None

106-3-3

BOD GO+122
FOD GO+152

FUNDING

($000)

AGENCY

DASA/
RDT&E
EAO 1106-}|

4101-61

ENGR

PROC

CONST

TOTAL

PRE-GO
Engineering costs included in F&S Number 26001
POST-GO
Estimate 12/65

TOTAL

FURN

31.1

31.1

31.1

31.1

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

106-002-Cl

106-3-3-Cl and El
POST-GO

PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command furnished items are as follows:

ment trailers;

b) eight 60-ft. antennas, and,

a} two instru-

c) optical instrumentation.

The

contractor will perform the following: a) erect a combination office laboratory,
16 x 32-ft. wood frame tent, supplied with 5 kwelectrical power; b) provide
each of the two instrument trailers with 20 kw electrical power;

eight (8) 4x4 x 1/2-ft. thick concrete pads; and
on the completed pads.

c)} construct

d) erect the TC 60-ft. antennas

The total electrical installation requires two contractor

furnished 50 kw, 120/240 volt, 60 cycle, single phase generators.
generators is utilized as a back up power source.

One of the

The contractor will prepare level areas for the optical facilities and the antenna
areas. The optical instruments will have a line-of-sight in the horizontal azimuth
from northeast to south-southwest. Separate back up generators must be provided if optical and antenna areas are not tied together electrically. Subtask A628
will be located in the same area.
The project officer will conduct a field reconnaissance of the 3 AEC lease option

locations to determine the best possible site prior to selecting a permanent location for Subtask A615. Refer to Figure A-24, Appendix A for general location of
areas at Raki Raki, Ellington Wharf and Tucuriu School, Suva. The two scientific persons assigned to Subtask A615 may live off the local economy.

27-5