PALMYRA
F&SNO.

TITLE

USER
TC

STRUCTURE/FACILITY NO.
None

25008

EM Detection Systems - Subtask A629

FUNDING
AGENCY

($000)

SCIENTIFIC STATION NO.
None

ENGR

PROC

Bop
Fop GO+90

CONST

TOTAL

8.3

8.3

8.3

8.3

FURN

SERVICE
FUNDED
POST -GO

Estimate 12/65

' TOTAL

PROJECT IN HOLD STATUS PENDING DETERMINATION OF NEED BY USER
PRIOR YEARS
ENGINEERING

Preliminary Planning.

Drawing:

101-002-C6
POST -GO

PROCUREMENT

To be accomplished.

CONSTRUCTION Test Command will furnish the following equipment: a) ifa
central power plant is not planned; one 30 kw, 120/240 volt, 60 cycle, 3 phase
generator; b) one 40-ft. instrument trailer; and c) one light sensor.

The contractor will perform the following: a) prepare a site location as far as
possible from transmitters and Subtasks A605, A611, and A628; b) drill two
4 1/2-in. diameter cased holes with the bottom 10-ft. (minimum) of the casing
cemented. The holes should have a 6 to 12-ft. horizontal separation and the
depths should differ by 100-ft. (+ 1 foot). The shallower hole will have a minimum depth of 20-ft. The holes should be drilled in rock or coral of uniform
density; c) locate the instrument trailer antenna so as to have a line-of-sight
to all events and at a minimum of 100-ft. from the cased holes; and, d) pro-

vide electrical hookup where required.
The project manager, USAF/ESD will determine the need and a site location for
Subtask A629 ata later date. Refer to Figure A-22, Appendix A, for possible
site location. Three scientific personnel will be assigned to Subtask A629 at
this location.

25-8

GG

VOL II

April 1969