OSE
MIDWAY
F&SNO.
24013
USER

TITLE
Aircraft Decontamination Pad
STRUCTURE FACILITY NO.

JTF-8

JTG 8.4

FUNDING

AGENCY

RDT&E
MILCON

SCIENTIFIC STATION NO.

None
($000)

BoD

None
ENGR

PROC

FoDGO+88%

CONST

TOTAL

POST-~-GO
Estimate 3/65

80.0

80.0

TOTAL

80.0

80.0

FURN

PRE-GO

ENGINEERING

To be initiated upon construction criteria submittal.

POST -GO
ENGINEERING

To be completed.

PROCUREMENT

To be completed.

CONSTRUCTION Navy Public Works Department will probably perform the
majority of work. A concrete pad approximately 70 x 300-ft. will be required
for decontamination of surveillance, diagnostic, sampler, sampler controller

and array control aircraft.

This is a monitoring, decontamination/washdown

installation for the aircraft. The location for the aircraft decontamination
pad has not been determined.

*FOD is required 30 days prior to "Minuteman" Nuclear Operational Systems
Test.

VOL II

24-12

Select target paragraph3