MIDWAY
F&sS NO.

TITLE

24011

Sampler Storage, Rad Safe

USER

STRUCTURE FACILITY NO.

JTF-8
JTG 8.4
FUNDING

($000)

BoD

None
ENGR

PROC

FOD GO+88°:

CONST

TOTAL

POST-GO
Estimate 3/65

2.0

2.0

TOTAL

2.0

2.0

AGENCY

RDT&E
MILCON

SCIENTIFIC STATION NO.

None

FURN

PRE-GO
ENGINEERING

To be initiated upon construction criteria submittal.

POST -GO
ENGINEERING

To be completed.

PROCUREMENT

To be completed.

CONSTRUCTION Navy Public Works Department will probably perform the
majority of work. A fenced~-in area approximately 10 x 10-ft. will be required
for the Rad Safe sampler storage area. Sampler storage location has not been
determined.

*FOD is required 30 days prior to ''Minuteman'" Nuclear Operational Systems
Test.

VOL II
April 1969

24-10

Select target paragraph3