FRENCH FRIGATE SHOALS

F&SNO.

22009

USER

TITLE

Weather Station, USAF Air Weather Service (AWS)

STRUCTURE FACILITY NO.

JTF -8

| SCIENTIFIC STATION NO.

None

FUNDING
AGENCY

($000)

BoD

None

ENGR

JTE
MILCON

PRE-GO
Prior Costs*

CRO 7-65

POST -GO

PROC

FOO GO+3

TOTAL

2.0

FURN

2.0

Estimate 12/65

TOTAL

CONST

GO+23

2.0

26.0

26. Ox

26.0

28.0

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

93-002-C2
93-038-Cl and El

TYP 035-Al and A3
TYP 036-Al
POST-GO

PROCUREMENT

To be accomplished.

CONSTRUCTION

The contractor will furnish the following items:

lo x 32~ft. tents;

b) four 4+ x 4 x 6-ft. hot lockers: and,

a) two

c) two 20 kw, 120/203

volt, 00 cycle, 3 phase generators. One of the generators will be utilized as a
back up power source. In the event a central power system for the island is
provided, only the back up generator will be required.
The contractor will perform the following: a) prepare a level 60 x 250-ft. site
oriented to the prevailing winds; when siting scientific equipment, obstructions
within 500 yards in excess of 5° above the surtace as well as signal reflections
from metal buildings should be avoided; b) erect a 16 x 32-ft. joint operations
tent, with flooring,

screen doors and screen siding with side tlaps extended at

the approximate slope of the tent roof for the use of AWS and communications
personnel;

c) erecta 16 x 32-ft.

ventilation and insect control;

maintenance and supply tent,

screened for

4) install four hot lockers for storage of elec ~

tronic spare parts; 3) construct one 10 x 10-ft. concrete pad with ground rod
in center; f) construct a 3 x 3-ft. concrete pad, with tie-down rings, located

*Includes engineering costs for F&S Nos. 21014, 21015, 22010, 25010, 25011

and 26005.
**Includes construction costs for F&S No. 22010.
22-11

VOL II
@