FRENCH FRIGATE SHOALS
F & S NO.
TITLE
22007
Camp
USER

STRUCTURE /FACILITY NO.

JTF-8

SCIENTIFIC STATION NO.

None

None

BOD GO+e3
Foo GO+30

FUNDING
AGENCY

{$000)

JTF-8/

PRE-GO

CRO 7-65}

POST-GO

MILCON

ENGR

PROC

CONST

Prior Cost* 14.9

FURN

14.9

Estimate 12/65**
TOTAL

TOTAL

14.9

205.1

205.1

205.1

220.0

IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING
Drawings:

Plan HIB Preliminary Drawings - Completed.

93-002-Cl and C2
93-023-Al
93-024-Al

93-043-Al, El, Ml
93-078-Cl
93-095-El and E2

TYP 035-Al and A3
TYP 036-Al

PROCUREMENT
at Damon Tract.

Some major items for Plan Ili B type camps are in stockpile

CONSTRUCTION

Will be accomplished Post-GO.

POST -GO
ENGINEERING Plan IIIB Preliminary Drawings - Completed.

If military

field camp concept is adopted, engineering will be completed in the field, Post-

GO.

PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing scientific and support personnel.
ments and material costs.

JTF-8 is currently reviewing support camp require-

*Includes engineering costs for F&S Numbers 21010, 25007, 26006 and 27005.
** Includes mobilization and demobilization costs based on Plan IIIB concept.