FRENCH FRIGATE SHOALS
F&SNO.

TITLE

22005

EM Detection Systems - Subtask A629

USER

STRUCTURE /FACILITY NO.

TC

SCIENTIFIC STATION NO.

None

BOD

None

FOO GO+90
FUNDING

($000)

AGENCY

ENGR

PROC

CONST

TOTAL

FURN

SERVICE
FUNDED

POST-GO
Estimate 12/65

8.3

8.3

TOTAL

8.3

8.3

PROJECT IN HOLD STATUS PENDING DETERMINATION OF NEED BY USER
PRIOR YEARS

ENGINEERING

Drawing:

Preliminary Planning.

93-002-C2
POST -GO

PROCUREMENT

To be accomplished.

CONSTRUCTION Test Command will furnish the following equipment: a) if a
central power plant is not planned; one 30 kw, 120/240 volt, 60 cycle, 3 phase
generator; b) one 40-ft. instrument trailer; and, c) one light sensor.
The contractor will perform the following: a) prepare a site located as far as
possible from transmitter and Subtasks A609 and A628; b) drill two 4 1/2-in.
diameter cased holes with the bottom 10-ft. (minimum) of the casing cemented.
The holes should have a 6 to 12-ft. horizontal separation and the depths should
differ by 100-ft. (+ 1 foot). The shallower hole will have a minimum depth of
20-ft.

The holes should be drilled in rock or coral of uniform density; c) the

instrument trailer antenna should have a line-of-sight to all events and be located a minimum of 100-ft. from the cased holes; and, d) provide electrical
hookup where required.
The project manager, USAF/ESD will determine the need and a site location
for Subtask A629 ata later date. Refer to Figure A-19, Appendix A, island

plot plan.

Three scientific personnel will be assigned to Subtask A629 at this

location.

22-7
oon nied ’ ’

VOL II
April 1969

Select target paragraph3