CU

FRENCH FRIGATE SHOALS

FaSNO.
22001

TITLE
Debris Tracking by Resonant Scattering Equipment - Subtask A606

USER

STRUCTURE ‘FACILITY NO.

TC

FUNDING
AGENCY
DASA/
RDT&E
EAO 1106-{|

4101-61

SCIENTIFIC STATION NO.

None

($000)

ENGR

BoD

93-3-1

PROC

CONST

TOTAL

GOr138

FOOGO+159
FURN

PRE-GO
Engineering costs included in F&S Number 21001.
POST-GO

Estimate 12/65

| TOTAL

8.9

8.9

8.9

8.9

PRIOR YEARS
ENGINEERING Completed.
Drawings:

93-002-C2

93-3-1-Cl

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION A technical operations shelter will be required to provide
office and recording instrument space. This building will be 8 x 8-ft. of wood
frame construction with plywood siding, and corrugated aluminum roof and
erected on a concrete slab. It will be air conditioned and dehumidified to 50
percent humidity. A 6 x 6-ft. concrete pad 18-in. thick will be constructed

about 20-ft. from the building for mounting TC furnished camera equipment.

Electric power, including back up, will be provided by two 5 kw, 120/240 volt,
60 cycle, single phase generators.

Refer to Figure A-19, Appendix A, for site

location. The number of scientific personnel assigned to Subtask A606 at this
location is one.

22-3

VOL Il

April 1969