CANTON
F&S NO.

TITLE

21010

Camp

USER

STRUCTURE/FACILITY NO.

SCIENTIFIC STATION NO.

None

None

JTF-8

B00 GO+23

Fop GO+30
FUNDING
AGENCY

JTF-8/
MILCON
CRO 7-65

($000)

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO
Engineering costs included in F&S Number 22007.
POST-GO
Estimate 12/65
152.7
152.7
TOTAL

152.7

152.7

IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING
Drawings:

Plan W1B Preliminary Drawings - Completed.

93-002-Cl
93-023-Al
93-024-Al

93-043-Al, Ml, El
93-078-Cl
93-095-El and E2

108-002-C2
TYP-035-Al and A3
TYP-036-Al

PROCUREMENT Some major items for Plan IIIB type camps are in stockpile
at Damon Tract.
CONSTRUCTION Will be accomplished Post-GO.

POST -GO
ENGINEERING Plan IIIB Preliminary Drawings - Completed. If military
field camp concept is adopted, engineering will be completed in the field, Post-

GO.

PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.

*Includes mobilization and demobilization costs based on Plan IIIB concept.

1-8

VOL II

April 1969