CANTON
F aS NO.
21003

TITLE
HF Communications Simulation Experiment - Subtask Aoll

USER

STRUCTURE FACILITY NO.

TC

SCIENTIFIC STATION NO.

None

BODGO+105

108-3-3

FUNDING
AGENCY

($000)

ENGR

DASA/

PRE-GO

RDT&E
EAO 1106-|
4101-61

Prior Costs* 2.0
POST-GO
Estimate 12/65

PROC

CONST

TOTAL

FoDGO+125
FURN

2.0
8.3

—

TOTAL

8.3

8.3

10.3

PRIOR YEARS
ENGINEERING

Drawing:

Completed.

108-002-C2
POST-GO

PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command furnished items are as follows:

a} three 110-ft.

high Log Periodic lonospheric antennas; b) one instrument trailer; and,

c) one

8 x 22-ft. camper trailer. The contractor will furnisn two 20 kw, 120/240 voit,
60 cycle, single phase, low speed (1250 rpm) diesel generators. One of the generators is utilized as a back up power source.
The contractor will perform the following: a) prepare a cleared, flat, 540 x 020-

ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antennas which will have a ground screen that extends into the sea; b) construct

concrete antenna bases, as designed by TC in the field; c) provide longeron pads
and anchors for the antennas; d) site the instrument trailer and camper trailer;
and,

e} install the generators and complete the electrical hookup to the instrument

trailer.

Refer to Figure A-18, Appendix A, for site location.

personnel are assigned to Subtask A611) at this location.

*Includes engineering costs for F&S Numbers 24007,
29001 and 30001.

Four scientific

25003, 26004, 27002, 28001,
-

21-5

VOL II

April 1969