Cerna
KIRTLAND AFB

SUPPORT

F&SNO.

TITLE

19008

Electrical Power System

USER

|

STRUCTURE/FACILITY NO.

JTF

SCIENTIFIC STATION NO.

None

BOD

None
FOD

FUNDING
AGENCY

($000)

AEC

ENGR

PROC

CONST

FURN

PRE-GO

|
Costs Included in F&S No.

18001

COMPLETED
DESCRIPTION

A 750-kva substation (completed in 1964) lies west of the Trailer

Park onal2x18-ft. concrete slab.

A 12-ft. wide gateinthe enclosing 8-ft. high

‘chain link fence (with barbed wire outriggers) provides access to the 34 x 28-ft.
area.

Incoming overhead power is 4160 volt and 3 phase.

Outgoing power is fed to
Main Distribution Panel No. 1 (480 volt, 60 cycle, 3 phase) which, in turn,
feeds three secondary distribution components as follows:
Transformer and Distribution Panel No.

3 phase.

2:

225 kva, 480-208Y/120 volt,

Panel is 800 amp with a 4 wire bus.

Transformer and Distribution Panel No.

3:

Motor Generator and Distribution Panel No.

Similar to No.

2.

4.

The Motor Generator is 60 kw, 480-208Y/120 volt, 400 cycle, 3 phase

with a 400 amp,

120/208 volt, 3 phase bus.

General Area Power

1.

Two, Ikva, single phase, 480-120/240 volt transformers furnish
power to the simulator site.

2.

One,

3 kva,

single phase, 480-120/240 volt transformer furnishes

power to the guardhouse at the main gate.
3,

One,

3 kva,

single phase,

480-120/240 volt transformer furnishes

power to security lights and obstruction lights.

DRAWINGS:
VOL II

Spee

K-058-E1 thru E6

K-058-E13
19-4

aes!