KAUAI, AEC-TRE

COMMUNICATIONS

F&S NO.

TITLE

13005

Sandia Signal Cable

USER

STRUCTURE FACILITY NO.

SANDIA

SCIENTIFIC STATION NO.

None

BoD

None
FODGO+120

FUNDING
AGENCY

AEC

($000)

ENGR

PROC

8.5

206. 1

PRE-GO
Prior Cost

CONST

TOTAL

5. 4:

FURN

220.0

POST-GO
Estimate
| TOTAL

TO BE DETERMINED
8.5

206. 1

5.4

220.0

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

F97-079-W4 and W7

PROCUREMENT

F97-079-W15 thru W27

Completed.

CONSTRUCTION Signal cables are laid to the following launchers and launch

pads:

Launcher Nos.: 8,

9,

10,

ll,

12,

13,

14,

15,

16 and 19

Launch Pad Only, No.: 18
The cables are conveyed between launchers by above-grade cable trays and by

direct burial.

:

The cable from the launch pad area is run in an embedded concrete trough to
the signal cable shelter in the secure trailer compound.

—_———

“Cost is for cabletray modifications only; prior years costs for installation
of cables is included in F&S No. 11024.

POST-GO
ENGINEERING
Drawings:
VOL II

Completed.
F 97-079-W3 thru W6
13-4

Select target paragraph3