oii,
KAUAI, AEC-TRF

SUPPORT

12007

Page 3

Additional air conditioning ducts and additional joists to support them will be
installed. The entire building will be air conditioned by a unit located outside
the building.

A new power distribution panel and additional 120 volt and 250 volt receptacles
will be installed.

The existing fluorescent light fixtures will be rearranged.

12-5

CGE

VOL II

April 1969

Select target paragraph3