KAUAI, AEC-TRF

SUPPORT

F&S NO.

TITLE

12007

Payload Preparation Building

USER
SANDIA

STRUCTURE. FACILITY NO.
671

FUNDING
AGENCY

AEC

($000)

PRE-GO
Prior Cost
FY 69
TOTAL

SCIENTIFIC STATION NO.
None

Bop

Foo 9-1-69

ENGR

PROC

CONST

TOTAL

2.4

*2,3

32.4
20.0

37.1
20.0

2.4

2.3

52.4

57.1

FURN

PRIOR YEARS
ENGINEERING

Drawings:

Completed.

F 97-671-Al and A2

F 97-671-S1 and S2
F-97-671-El

PROCUREMENT

JS 97-671-Al

JS 97-671-E}
JS 97-671-M]1

F 97-671-M1

Completed.

CONSTRUCTION This 15 x 75 x 10-ft. high building which will be converted to
a payload preparation facility has been used as a maintenance shop Since its
completion in 1965. It is located south of the trailer park within a non-secure,
chain link fenced area of 1/4 acre.

The plywood-sided, wood-framed structure with a reinforced concrete floor slab
is partitioned into three rooms: a 10x 15-ft. tool room, a 15 x 40-ft. shop area,
and a 15 x 25-ft. office.
Wooden trusses and purlins support the corrugated aluminum roofing.
bear on timber columns tied into the wall framing.

Thetrusses

Air conditioning is restricted to the office which is served by a wall mounted unit.
The walls and ceiling of the office are lined with gypsum board and are insulated.
Roof mounted gravity ventilators and shutters in the walls of the tool room and
shop area provide ventilation.

*Costs applicable to modifications only. Engineering and Procurement costs
for building as originally constructed were included in the Construction cost.
L2-3
eo biol Ll ;

VOL II
April 1969

Select target paragraph3