An overhead bridge crane with a hoisting capacity of 4-tons and a hook lifth
of 15-ft. will be provided. The crane will be capable of traveling the full 80
length of the facility and will be designed for explosion proof operation.

Power supplied to the facility from Substation 681 will be 120/208 volt, 3 phi
Explosion proof mercury vapor fixtures will provide interior lighting. Area
lighting will be furnished by incandescent, weatherproof floodlights mounted
atop the revetment. Explosion proof convenience outlets (110 volt) will be
provided.

Numerous flush-mounted grounding receptacles distributed throughout the fl
slab will make possible the grounding of individual rocket motors. In additi
the facility will be further safeguarded by roof-mounted lightning rods.

An explosion proof air compressor will provide 125 psi compressed air to fc
(4) outlets in the staging area.
FY 1970

ENGINEERING

To be completed in FY 1969.

PROCUREMENT

To be completed in FY 1969.

CONSTRUCTION Of the total $100.0K construction cost of the facility,
$20.0K will be spent during FY 1970.
POST -GO
ENGINEERING Engineering to be accomplished Post-GO will probably invol
mainly siting and grading plans since much of the engineering for the Pre-G(
facility should be applicable to the Post-GO facility.
PROCUREMENT

Will be completed Post-GO.

CONSTRUCTION One (1) additional staging and holding facility, identical to
the Pre-GoOfacility, will be constructed.

VOL II
April 1969

11-28