‘ ORDEAL KAUAI, AEC-TRF SCIENTIFIC 11013 Page 2 Each building is air conditioned and dehumidified by two (2) units. gravity ventilators are mounted on the ridge line of the roof. Electrical power supplied is 120/208 volt, 60 cycle, 6 phase. Three The interior of the buildings and the exterior doorways are lighted by incandescent fixtures. A lightning protection system safeguards the building. The air conditioning, dehumidification and aluminum siding were completed in 1968 to enhance the weatherproofing and comfort qualities of the buildings. As originally constructed, the buildings were sided with roll up, fire-resistant canvas. FY 1971 ENGINEERING PROCUREMENT To be accomplished. To be accomplished, CONSTRUCTION Two (a) additional Rocket Assembly Buildings, identical to the existing two, will be constructed during FY 1971. POST-GO An additional Rocket Assembly Building may be required. VOL II April 1969 11-10