KAUAI AEC-TRE
F &S NO.

11013
USER

SANDIA

SCIENTIFIC

TITLE

Rocket Assembly Buildings
STRUCTURE. FACILITY NO.

Existing:

656 and 66)

Future:

Unnumbered

FUNDING

($000)

AGENCY

AEC

eee

ENGR

SCIENTIFIC STATION NO.

BoD

None
FOO GO+120
PROC

CONST

TOTAL

PRE-GO
Prior Cost
FY 71

6.3
12,0

159.7
114.0

* 166.0
126.0

TOTAL

18,3

273.7

292.0

FURN

PRIOR YEARS
ENGINEERING

Drawings:

Completed,

F 97-656-Al and A2

F
F
JS
JS

97-656-S1 and S2
97-656-E1
97-3224C -A2@ and A3
97-3224C -E6

PROCUREMENT

JS 97-656-Al

JS
JS
JS
JS

97-656-El
97-656-M1l
97-061-Al
97-6601-E}

F 97-661-Al and A2

F 97-661-E1l and E2
F 97-661-S1] and S2
F 97-661-Ml
97-3224B-S1

Completed.

CONSTRUCTION Two (2) Rocket Assembly Buildings (completed in 1965) are
36 x 38-ft. in plan with corrugated aluminum siding and roofing. The roofing
rests on wood purlins supported by intermediate steel trusses and wood end
walls. The trusses bear on timber columns tied into the wall framing.
The high bay assembly area is 30 x 36-it. 6-in. with a clear height of 12-ft.
o-in. An 8 x 36-ft. lean-to on the north side of the building has a clear height
of 8-ft. andis divided into an 8 x 8-ft. workroom and an 8 x 28-ft. office storage
area. The floor is a reinforced concrete slab which has been extended 20-ft.
out on the east and west sides of the building to form exterior flared loading
aprons 30-ft. wide.

The slab is designed to sustain a load of 2000 psi.

The insulated roofs and walls are paneled with gypsum wallboard.
bay area has four 8 x 8-ft. vehicle doorways.

The high

One 2 ton and one 3 ton chain hoist traverse the width of the high bay area,
one on each of two parallel monorails 12-ft. apart.

“Includes engineering's estimated distribution of cost gf $106.0Kfroml. D.
No. 13921.
11-9

VOL Il

Select target paragraph3