HICKAM AFB

SCIENTIFIC AND SUPPORT

07023

Page

2

Remove existing partitions and construct new partition walls to form a
9x 12-ft. office anda 7 x 33-ft. darkroom.

Fabricate and install a platform 2-ft. 4-in. high and 33-ft. long inside
the darkroom.
In the center of the building, remove a 16 1/2 x 19-ft. portion of the
ceiling to provide installation space for the EG&G furnished processing
machine.
Provide new interior fluorescent lights.
Provide 40 kva,

120/208 volt,

60 cycle,

3 phase power by tieing into

an overhead power line.
Install a humidity controlled air conditioning system.
of 20-80% will be maintained.

A relative humidity

Install a 67 gallon hot water heater and associated plumbing to meet the
maximum of ten gallons per minute of 100°F water demanded by the developing machine.