Seer
HICKAM AFB
07018

SCIENTIFIC AND SUPPORT
Page 2

ITEM

USER

Office and Laboratory Space

TC

Office and Laboratory Space

Unassigned

Office Space
General Space (Hallways,

APPROX, AREA

Latrines,

etc.)

12,200 sq. ft.*

4,100 sq. ft.

JTF -8

4,300 sq. ft.

—_——_

7,300 sq.

ft.

Interior floor finish varies from exposed concrete on the first floor to asphalt
tile on the second and third floors. Interior walls and ceilings are mainly gypsum board, with some rooms having acoustical ceilings and/or walls. Rooms
223,

280,

286,

and 287 have reflected ceilings; Room 223 also has a raised floo:

Nominal ceiling height varies from floor to floor: 1l2-ft. for the first floor, 11] 12ft. for the second floor and 8-ft. for the third floor.
Interior lighting is by fluorescent fixtures with battery powered lights provided
for emergency lighting in the event of commercial power failure. Convenience
outlets of 110 volt capacity are provided throughout. A 750 kva substation located in a mechanical and electrical equipment room annex transforms incoming 11.5 kv power and serves the building with the following power: 120/208

volt, 60 cycle, 3 phase; 120/240 volt, single phase; and 277/480 volt, 60 cycle, 3 phase.

The building's air conditioning system is designed to maintain a temperature
range between 70 and80°F and a relative humidity of 50%. Telephone service,
a fire alarm system, an automatic sprinkler system, and latrine facilities are
provided.

A communication center,

screen room, and message center are lo-

cated within the building (Refer to F&S No. 06007 for details).

PRE-GO
PROCUREMENT Procurement of long lead items necessary to provide computer space for Subtask A909 (Refer to Post-GO, below) will be initiated upon
approval of funds by JTF-8. The items to be procured will include a 500 kva
transformer, air handling units, and materials for a false elevated floor.
POST -GO
ENGINEERING

To be completed.

95-2060. 1-A7 and A8

Drawings issued (for approval) to date are:
95-2060. 1-E7 thru Ell
95-2060. 1-M8 thru M11

“Includes 1000 sq. ft. for Subtask A909.
VOL II

April 1969

-

Select target paragraph3