HICKAM AFB
07002A
(H)

SCIENTIFIC AND SUPPORT
Page 3

The ditch at the southeast corner df the trailer park will be realigned
or culverted.

(I)

The trailer docks will be recabled.

(J)

Additional 400 cycle power will be provided to meet added requirements. The following facilities require 400 cycle power:

USER

LOCATION

EG&G

Trir. No.

1

50

75

Trir. No.

3

50

75

Trlr. No.

8

25

50

Trir. No. 9
Trir. No. 12
Bldg. T-3208

25
5
5

50
25
25

Trir. No. 7
Trir. No. 9

20
20

20
20

3

4

LRL

SANDIA Trlr.

No.

AMPS, PRE-GO

F-2

Trlr. No. 9

10

Lo

No.

11

3

4

Trir. No.

12

3

4

3

4

Trir.

LASL

Trir.

No. B-13

Trir.

No.

8

Trlr. No. 9 (4-16-3)
Trlr.

No.

2

Bldg. No. T-3207
(K)

14

14

0

l4

0

14

14

14

A machine shop will be constructed for LRL (see Volume II, Plot

and Site Plans, HAFB, and F&S No. 07060).

VOL II

AMPS, POST-GO

7-10

Select target paragraph3