nes
~ 7.
OKINAWA
F&S NO.
TITLE
30001
HF Communications Simulation Experiment - Subtask A611
USER
STRUCTURE “FACILITY NO.
TC
None
FUNDING
AGENCY
($000)
Bop
SCIENTIFIC STATION NO.
119-31
ENGR
PROC
CONST
TOTAL
PRE-GO
Engineering costs included in F&S Number 21003.
EAO 1106-
POST-GO
Estimate 12/65
TOTAL
GOr1)>
FOD9. |
DASA/
RDT&E
4101-61
0s
8.3
8.3
8.3
8.3
FURN
PRIOR YEARS
ENGINEERING
Completed.
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command furnished items are as follows:
high Log Periodic IJonospheric antennas; and,
contractor will furnish two 20 kw,
a) two 110-ft.
b) one instrument traile r.
120/240 volt,
60 cycle,
The
single phase, low
speed (1250 rpm) diesel generators. One of the generators is utilized asa back
up power source. In the event local power 1s available. only back up power is
required.
The contractor will perform the following: a) prepare a cleared, flat, 355 x 515ft. unobstructed area for the TC erected 110-tft. high Log Periodic Ion ospheric
antennas which will have a ground screen that extends
concrete antenna bases, as designed by TC in the field;
pads and anchors for the antennas;
into the sea;
b) construct
c) provide lon geron
d) site the instrument trailer; and,
e) install
the generators if local power is not available, and complete the electrical hookup
to the instrument trailer. The site location will be selected after a re connais sance by the project officer. Six scientific personnel will be assigned to Subtask
A6oll at this site.
30-1
VOL II
April 1969
=