aight.
WAKE
F&S NO.
TITLE
28001
HF Communication Simulation Experiment - Subtask A611
USER
STRUCTURE/FACILITY NO.
TC
SCIENTIFIC STATION NO.
None
BoD
111-3-1
05
Go*l
FOD GO+125
FUNDING
AGENCY
DASA/
RDT&E
0
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Engineering costs included in F&S Number 21003.
EAO 1106-) POST -GO
4101-61
Estimate 12/65
“TOTAL
8.3
8.3
8. 3
8. 3
PRIOR YEARS
ENGINEERING
Drawing:
Completed.
-111-002-Cl
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command furnished items are as follows:
high Log Periodic Ionospheric antennas; and,
a) two 110-ft.
b) one instrument trailer.
The
contractor will furnish two 20 kw, 120/240 volt, 60 cycle, single phase, low
speed (1250 rpm) diesel generators. One of the generators is utilized as a back
up power source. In the event local power is available, only back up power is
required.
The contractor will perform the following; a) prepare a cleared, flat, 440 x 670ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antennas which will have a ground screen that extends into the sea; b}) construct
concrete antenna bases, as designed by TC in the field;
pads and anchors for the antennas;
c) provide longeron
d) site the instrument trailer; and,
e)} install
the generators and complete the electrical hookup to the instrument trailer. Refer to Figure A-25, Appendix A, for site location. The four scientific personnel
assigned to Subtask A611 will also operate Subtask A628 at this site.
28-3
VOL Ii
April 1969