VITI LEVU, FIJI
F & S NO.
27003
TITLE
Measurement of Gamma,
Neutron, and Visible Radiation from
Fission Debris - Subtask A615
USER
TC
STRUCTURE /FACILITY NO.
SCIENTIFIC STATION NO.
None
106-3-3
BOD GO+122
FOD GO+152
FUNDING
($000)
AGENCY
DASA/
RDT&E
EAO 1106-}|
4101-61
ENGR
PROC
CONST
TOTAL
PRE-GO
Engineering costs included in F&S Number 26001
POST-GO
Estimate 12/65
TOTAL
FURN
31.1
31.1
31.1
31.1
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
106-002-Cl
106-3-3-Cl and El
POST-GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command furnished items are as follows:
ment trailers;
b) eight 60-ft. antennas, and,
a} two instru-
c) optical instrumentation.
The
contractor will perform the following: a) erect a combination office laboratory,
16 x 32-ft. wood frame tent, supplied with 5 kwelectrical power; b) provide
each of the two instrument trailers with 20 kw electrical power;
eight (8) 4x4 x 1/2-ft. thick concrete pads; and
on the completed pads.
c)} construct
d) erect the TC 60-ft. antennas
The total electrical installation requires two contractor
furnished 50 kw, 120/240 volt, 60 cycle, single phase generators.
generators is utilized as a back up power source.
One of the
The contractor will prepare level areas for the optical facilities and the antenna
areas. The optical instruments will have a line-of-sight in the horizontal azimuth
from northeast to south-southwest. Separate back up generators must be provided if optical and antenna areas are not tied together electrically. Subtask A628
will be located in the same area.
The project officer will conduct a field reconnaissance of the 3 AEC lease option
locations to determine the best possible site prior to selecting a permanent location for Subtask A615. Refer to Figure A-24, Appendix A for general location of
areas at Raki Raki, Ellington Wharf and Tucuriu School, Suva. The two scientific persons assigned to Subtask A615 may live off the local economy.
27-5
VOL If
~
a