Ganneaeee
UPOLU
F &S NO.
TITLE
26006
Camp
USER
STRUCTURE/FACILITY NO.
JTF -8
SCIENTIFIC STATION NO.
None
Bop
None
FOD GO+120
FUNDING
AGENCY
JTF-8/
MILCON
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Engineering costs included in F&S Number 22007.
CRO 7-65] POST-GO
Estimate 12/65*
212.1
212.1
TOTAL
212.1
2iz.l
IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING Plan IIB Preliminary Drawings - Completed.
Drawings:
93-002-Cl
93-023-Al
93-024-Al
93-043-Al, Ml, El
93-078-Cl
93-095-El] and E2
121-002-Cl
TYP-035-Al and A3
TYP-036-Al
PROCUREMENT
at Damon Tract.
Some major items for Plan IIIB type camps are in stockpile
CONSTRUCTION
Will be accomplished Post-GO.
POST -GO
ENGINEERING Plan NIB Preliminary Drawings ~ Completed. If military
field camp concept is adopted, engineering will be completed in the field, Post-
GO.
PROCUREMENT
Should be accomplished Pre-GO-
CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.
*Includes mobilization and demobilization costs based on Plan IIIB concept.
26-8
CORE,
VOL II
Aprth 1909