UPOLU
F &S NO.
26004
TITLE
HF Communications Simulation Experiment - Subtask A611
USER
STRUCTURE “FACILITY NO.
TC
None
SCIENTIFIC STATION NO.
BOD GO+105
121-3-4
ENGR
PROC
CONST
FOOD GO+125
($000)
DASA
PRE -GO
EAO 11064
4101-61
POST-GO
Estimate 12/65
8.3
8.3
TOTAL
8.3
8.3
RDT&E
FURN
TOTAL
FUNDING
AGENCY
Engineering costs included in F&S Number 21003
PRIOR YEARS
ENGINEERING
Completed.
Drawing:
121-002-Cl
POST-GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command furnished items are as follows:
a)
one
110-ft.
high Log Periodic Ionospheric antennas; and, b) one instrumenttrailer.
The
contractor will furnish two 20 kw, 120/240 volt, 60 cycle, single phase, low spee
(1250 rpm) diesel generators.
One of the generators is utilized as a back up
power source.
The contractor will perform the following: a) prepare a cleared. flat 180 x 370ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antennas which will have a ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field;
and anchors for the antennas;
c) provide longeron pads
ad) site the instrument trailer; and e) install the
generators and complete the electrical hookup to the instrument trailer. The site
location will be selected after a reconnaissance by the project officer. Refer to
Figure A-23, Appendix A. for general location.
The five scientific personnel
assigned to Subtask A611 will also operate Subtask A628 at this location.