eee
UPOLU
F&S NO.
26001
TITLE
Measurement of Gamma, Neutron, and Visible Radiation from
Fission Debris - Subtask A615
USER
STRUCTURE /FACILITY NO.
SCIENTIFIC STATION NO.
TC
None
121-3-1
BOD cO+122
FOOD GO+152
FUNDING
AGENCY
($000)
ENGR
DASA/
RDT&E
PRE-GO
Prior Cost
EAO 1106-|
POST-GO
4101-61
PROC
CONST
TOTAL
1.3
1.3
Estimate 12/65
TOTAL
FURN
1.3
31.1
31.1
31.1
32.4
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
121-002-Cl
121-3-1-Ci and El
POST-GO
PROCUREMENT
ft.
To be accomplished.
Contractor will also provide 10,000 cu.
of (STP) helium.
CONSTRUCTION
Test Command furnished items are as follows:
ment trailers; b) eight (8) 60-ft.
a} two instru-
antennas; c) balloon launch instrumentation;
and, d} optical instrumentation. The contractor will perform the following: a)
erect a combination office laboratory, 16 x 32-ft. wood frame tent, supplied
with 5 kw,
electrical power; b) provide each of the two instrument trailers with
20 kw electrical power; c) construct eight (8) 4 x 4x 1/2-ft. concrete pads and
d) erect the TC 60-ft. antennas on the completed pads. The total electrical
installation requires two contractor furnished 50 kw,
single phase generators.
source.
120/240 volt,
60 cycle,
One of the generators is utilized as a back up power
The antenna area will be located at a minimum of 3 miles from the Subtask
A616 site. The contractor will prepare level areas for the balloon launch facilities, optical facilities and the antenna area. The optical area will havea
line-of-sight in a horizontal azimuth from northeast to south-southwest. If
optical and antenna areas are not tied together electrically, separate back up
generators will be required. A site will be selected after the project officer
has made a field reconnaissance of the area shown in Figure A-23, Appendix
A. Three scientific personnel will be assigned to A615 at this location.
*Includes engineering costs for F&S No. 27003.
26-3
SECT,
VOL I
om