COPELSata
PALMYRA
F&S NO.
25011
ITE -8
TITLE
Communication Center
(U. S. Army Strategic Communication Command)
STRUCTURE
'F
Y NO.
None
0
|
TON
eee None
0 NO.
0
BoD GO+23
FOR GO+30
FUNDING
AGENCY
JTF
MILCON
CRO7-65
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Engineering costs are included in F&S No, 22009.
POST-GO
Construction cost estimate included in F&S No.
25010.
PRIOR YEARS
ENGINEERING
Drawings:
Completed,
TYP-035-Al and A3
TYP-036-Al
101-002-C6
101-038-Cl and El
POST -GO
PROCUREMENT
To be accomplished
CONSTRUCTION
The U. S. Army Strategic Communication Command will
furnish 3 communication vans.
The contractor will construct a 20 x 20-ft.
concrete pad for siting the communication vans.
The Communication Center will share the maintenance and joint operations
tents with the U. S. Air Force Air Weather Service facility (F&S No. 25010).
The joint installation is located about 2000 yards northwest of the aircraft
landing strip at the old ship pier. Refer to Figure A-22, Appendix A, for
site location. Transmitting, receiving and cryptographic service will be
provided to all agencies located on this island. One officer and 25 EM from
a Provisional Army Signal Unit (PASU),
Team A-2, will operate the communi-
cation center at this location.
VOL II
April 1969
25-12