25003
HF Communications Simulation Experiment - Subtask A611
USER
TC
STRUCTURE, FACILITY NO.
FUNDING
($000)
AGENCY
DASA
SCIENTIFIC STATION NO.
-
BooGO~ 10>
101-3-3
None
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
RDT&E
Engineering costs included in F&S Number 21003
EAO 11064 POST-GO
4101-61
FOO GO+125
Estimate 12/65
TOTAL
8.3
8.3
8.3
8.3
FRIOR YEARS
ENGINEERING
Completed.
Drawing:
101-002-C6
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION Test Command furnished items are as follows: a) one 110-ft.
high Log Periodic Ionospheric antenna; b}) one instrument trailer; and, c) one
8 x 22-ft.
camper trailer.
The contractor will furnish two 20 kw,
60 cycle, single phase, low speed (1250 rpm) diesel generators.
generators 1s utilized as a back up power source.
120/240 volt,
One of the
The contractor will perform the following; a) prepare a cleared, flat, 230 x 370ft. unobstructed area for the TC erected 110-ft. high Log Periodic Ionospheric
antennas which will havea ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field; c) provide longeron
pads and anchors for the antennas; d) site the instrument trailer and camper
trailer; and, e) install the generators and complete the electrical hookup to
the instrument trailer. Refer to Figure A-22, Appendix A, for site location.
The four scientific personnel assigned to Subtask A611 will also operate the
Subtask A628 facility at this location.
25-5