MIDWAY
F&sS NO.
TITLE
24011
Sampler Storage, Rad Safe
USER
STRUCTURE FACILITY NO.
JTF-8
JTG 8.4
FUNDING
($000)
BoD
None
ENGR
PROC
FOD GO+88°:
CONST
TOTAL
POST-GO
Estimate 3/65
2.0
2.0
TOTAL
2.0
2.0
AGENCY
RDT&E
MILCON
SCIENTIFIC STATION NO.
None
FURN
PRE-GO
ENGINEERING
To be initiated upon construction criteria submittal.
POST -GO
ENGINEERING
To be completed.
PROCUREMENT
To be completed.
CONSTRUCTION Navy Public Works Department will probably perform the
majority of work. A fenced~-in area approximately 10 x 10-ft. will be required
for the Rad Safe sampler storage area. Sampler storage location has not been
determined.
*FOD is required 30 days prior to ''Minuteman'" Nuclear Operational Systems
Test.
VOL II
April 1969
24-10