F&SNO.
TITLE
24007
HF Communications Simulation Experiment - Subtask A611
USER
STRUCTURE-FACILITY NO.
SCIENTIFIC STATION NO.
BOD
112-3-7
None
TC
GO+105
FOD GO+125
FUNDING
AGENCY
DASA/
RDT&E
EAO 1106-|
4101-61
000
($000)
N
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Engineering costs included in F&S Number 21003
POST-GO
Estimate 10/65
8.3
8.3
TOTAL
8. 3
8.3
PRIOR YEARS
ENGINEERING
Completed
Drawing:
112-002-Cl
POST -GO
PROCUREMENT
To be accomplished
CONSTRUCTION The Navy Public Works Department will probably perform
the majority of work. Test Command furnished items are as follows: a) one
110-ft. high Log Periodic Ionospheric antennas; and,
b) one instrument trailer.
If local power is not available two 20 kw, 120/240 volt, 60 cycle, single phase,
low speed (1250 rpm) diesel generators are required. One of the generators
is utilized as a back up power source.
The Navy Public Works Department will perform the following:
cleared, flat,
a) prepare a
310 x 320-ft. unobstructed area for the TC erected ]10-ft.
high
Log Periodic lonospheric antennas which will have a ground screen that extends into the sea; b) construct concrete antenna bases, as designed by TC
in the field; c) provide longeron pads and anchors for the antennas; d) site
the instrument trailer; and,
e) install the generators and complete the elec-~
trical hookup to the instrument trailer. Refer to Figure A-21, Appendix A,
The four scientific personnel assigned to Subtask A6)]) will
also operate the Subtask A628 facility at this location.
for site location.
24-7
VOL II
April 1969