~Lebiaeihe.
FRENCH FRIGATE SHOALS
F &S NO.
TITLE
22011
Radiological Surveillance Facility, SECONDARY
USER
STRUCTURE /FACILITY NO.
JTG 8.7
|
SCIENTIFIC STATION NO.
None
B0D
None
como
Foo GO+50
FUNDING
AGENCY
AEC
PROC
ENGR
($000)
CONST
TOTAL
FURN
No Cost
POST -GO
ENGINEERING
None required.
PROCUREMENT
None required.
CONSTRUCTION The U. S. Public Health Service (USPHS)
radiological surveillance equipment which requires 1.5 kw,
Single phase electrical power. No building or construction
U. S, Air Force Air Weather Service (AWS) facilities (F&S
used.
will furnish portable
110 volt, 60 cycle,
is required as the
No. 22009) will be
This facility is designated a SECONDARY radiological surveillance station because the civilian and JTF -8 population are relatively remote from test areas.
The radiological surveillance activities of this installation include the continuous monitoring of external radiation levels, and the testing of radionuclide
content of food, air, drinking water and rainfall.
AWS personnel will operate
the radiological equipment.
Apri1969
VOL Il
22-14
GQSSL
|